Production Documentation
Tech Pack Template: What Every Factory Needs to Quote Accurately
A clear tech pack connects your design, materials and measurements to the quotation and sample review. Use this checklist to record the decisions a factory needs.
July 29, 2026 · Updated September 26, 2026 · 10 min read
Table of Contents
1. What Is a Tech Pack (In 30 Seconds)
A tech pack — short for technical package — is the instruction manual a factory uses to make your garment. Think of it as the bridge between your design idea and a sewing machine operator who has never seen your brand.
It tells the factory:
- What the garment looks like (flat sketches, callouts)
- What materials to use (fabric, trims, labels)
- How big it should be (measurements for every size)
- How to put it together (construction details, stitch types)
- How to finish it (packaging, folding, hang tags)
A useful tech pack makes the quotation assumptions explicit. Identify unresolved choices instead of letting a reference photo stand in for fabric, construction or measurement specifications. Ask the factory to list any assumptions and exclusions in its quote.
2. Why a Bad Tech Pack Costs You Money
Here's what happens when your tech pack is incomplete:
| Missing information | Decision to record | What to check before sampling |
|---|---|---|
| Fabric specification | Composition, construction, weight and finish | Identify the proposed material reference and any unconfirmed substitutions. |
| Measurement method and tolerance | POM endpoints, garment condition and tolerance for each point | Check that the drawing and size chart use the same units and method. |
| Label placement | Label type, dimensions, attachment and distance from a named seam | Use a placement drawing that distinguishes the garment's left and right. |
| Packaging specification | Folding, packing format, quantities and carton marks | Confirm any buyer or warehouse requirements before costing. |
| Color reference | Agreed physical swatch or color standard and approval step | Identify the reference version; do not approve from screen appearance alone. |
Ask for the sample fee, included development work, revision charges and estimated timing for the agreed brief. Record what each round must resolve. The number of rounds depends on the design, materials and review outcome, so a complete tech pack does not promise a fixed saving.
3. The 8 Sections Every Factory Needs
Organize the tech pack into eight sections that can be checked against the same style and revision number. Mark any unresolved fields before requesting a quote.
Cover Page — Style Overview
Style number, season, date, designer name. Include a front-and-back flat sketch (black and white, no color). This is the first thing the pattern maker sees.
Construction Callouts — Every Detail Matters
Use arrows and notes on your flat sketch to show: seam types (overlock, coverstitch, flatlock), hem finishes, pocket placements, pleat directions, dart locations. Specify thread color and stitch density with units, such as stitches per inch (SPI) or stitches per centimetre. SPM means stitches per minute, a machine-speed measure, not stitch density.
For trousers with external utility pockets, the cargo pocket specification brief separates placement references, usable openings, folds and flap coverage.
Use the hoodie kangaroo pocket placement checklist to label the datum, dimension endpoints and pocket-opening geometry on a pullover drawing.
Bill of Materials (BOM) — The Complete Ingredients List
Every material that goes into the garment: shell fabric, lining, pocketing, ribbing, interfacing, thread, buttons, zippers, drawstrings, eyelets, elastic. For each: fiber composition, weight (GSM), color, supplier reference, placement.
For a zip-up style, use the hoodie zipper specification checklist to record the opening arrangement, exact component, length convention and placement before sampling.
For an adjustable jacket hem, connect the cord and lock references to the hem-adjustment sample record before approving a substitution.
For an eyelet revision, connect the specified hardware, backing where used and reinforcement with the hoodie eyelet sample observations; do not infer concealed construction from a photograph.
Color Specs — Record the Approved Reference
Record an agreed color standard or physical swatch for each color and identify its reference system. A screen image alone is not an approval standard. For prints, supply the artwork dimensions, placement and color references; confirm any required color separations with the print process.
For a hoodie back graphic, the back print placement checklist explains how to name the measurement datum, review hood coverage and assign print sizes to the garment range.
For a colour-block jacket, add a panel map with material and seam references so each colour area has a defined construction and named alignment checkpoints.
For the artwork attachment, the print artwork handoff checklist separates the approved design from production layers and physical print approval.
Measurement Chart — With Tolerances
List every Point of Measure (POM): chest width, body length, sleeve length, shoulder width, neck opening. Include the measurement for each size in your range, not just the base size. Add a tolerance for each POM and define how it is measured, including the garment condition and measurement endpoints. Agree tolerances for the material, construction and fit; there is no single tolerance for all woven or knitted garments.
For trousers, the waistband measurement and construction checklist separates relaxed and extended openings from the wearing check, and connects those definitions with the elastic, casing and closure.
For a boxy or oversized T-shirt, the T-shirt fit measurement brief connects width and length to clear shoulder, sleeve and hem references.
For caps, use the crown, brim and closure measurement brief to mark the endpoints, cap support condition and closure setting before comparing sample dimensions.
When a design changes its shoulder construction, use the raglan and drop-shoulder measurement brief to define comparable endpoints instead of copying a sleeve-length number between different seams.
Label & Branding Placement
Neck label (woven or printed?), size label, care label, flag label, hang tag, poly bag sticker. Include a diagram showing exact placement from a reference point (e.g., "neck label: 2cm below back neck seam, centered").
Use the clothing label placement brief to separate finished label dimensions from fold allowances and define the attachment, reading direction and sample checks.
Packaging & Folding Instructions
How should the finished garment be folded? In a poly bag or hanging? What size poly bag? Include a tissue paper? Carton dimensions and markings? This is often forgotten until the first shipment arrives completely wrong.
Fit Comments & Sample History
Leave space for factory feedback after each sample round. Record what changed from proto to fit sample to pre-production. This creates a paper trail and prevents the same mistake twice.
4. Start Your Tech Pack: Eight-Section Checklist
Start a tech pack worksheet
Use the eight sections above as a working structure. Give each style an identifier, revision date and list of open decisions.
Use the blank PDF and Excel project worksheets for measurements, materials and sample revisions. If some sections are still undecided, build an editable project brief and mark them “To confirm”. The worksheets do not contain approved measurements or production-ready specifications.
Discuss Your Tech PackShare the document you have and identify the sections that need development.
Copy these field groups into your document and complete the project-specific details:
- Style overview: style ID, revision, garment type and front/back drawings.
- Construction: seams, stitch types, openings and detail callouts.
- BOM: material and trim references, specifications, colors and placements.
- Colorways: the color reference for each component and the approval method.
- Measurements: POM method, units, size chart, tolerances and garment condition.
- Branding: artwork, label dimensions, placement and attachment.
- Packaging: folding, packing format, quantities and carton marks.
- Sample history: sample ID, dated observations, decisions and revision status.
5. Five Tech Pack Mistakes to Resolve Before Sampling
Mistake #1: Using artistic sketches instead of flat technical drawings
A fashion illustration can communicate design intent, but add front-and-back technical drawings that show seams, openings and construction details. Tools such as Adobe Illustrator or Canva can help draw them; check the proportions and callouts independently of the software.
Mistake #2: Guessing measurements instead of measuring a sample garment
If you use a reference garment, record the intended fit, measurement method and garment condition. Finished-garment measurements and pattern dimensions are different: do not substitute one for the other. Flag any measurements that still need development.
Mistake #3: Omitting fabric sourcing information
"100% cotton" is not enough. Is it combed or carded? Ring-spun or open-end? What's the GSM? Single jersey or interlock? The same fiber content can feel completely different depending on construction.
Mistake #4: Changing specs after sampling starts
Version the tech pack before sampling and record later design, material or fit changes in a revision log. Ask which changes affect the sample fee, schedule or approval scope before the next round starts.
Mistake #5: Sending the tech pack without reviewing it yourself
Read your tech pack as if you've never seen the design. Can you picture the finished garment? If any section makes you pause, the factory will pause too — and then guess.
6. Using Tech Packs for Quality Control
Use the agreed tech pack and approved sample together as the inspection reference. Record the inspection scope, defect classifications and acceptance rules before production.
During inline QC: Check the agreed construction details and measurement points while production is in progress. Record a mismatch, the affected scope and the corrective action rather than relying only on a verbal comment.
During final inspection: Compare the agreed POMs with their tolerances and record each out-of-tolerance result. That result is a nonconformity; acceptance of a production lot depends on the agreed sampling plan, defect classification and acceptance/rejection numbers. One measurement does not by itself define an AQL lot decision.
Before shipping: Compare labels, folding, packing quantities and carton marks with the approved packaging instructions. Record any deviations before dispatch.
Without a detailed tech pack, QC becomes subjective. "Looks about right" is not a standard. Your tech pack makes quality objective and measurable.
Need Help Creating Your Tech Pack?
Share your sketches and existing specifications to discuss tech pack support. Confirm the required drawings, BOM, measurements and construction details, along with responsibilities and deliverables, for your project.
Get Tech Pack SupportFrequently Asked Questions
Can I create a tech pack without Adobe Illustrator?
Yes. Tools such as Canva, Figma or PowerPoint can be used for drawings, with a spreadsheet for measurements and materials. The document still needs clear dimensions, construction notes, version control and a readable export.
How long does it take to create a tech pack?
Timing depends on the garment complexity and how much design information is already settled. A lined jacket may need separate shell, lining, trim and construction details. Agree the required deliverables and revision process before setting a completion date.
Do I need a different tech pack for each colorway?
Usually no. One tech pack covers all colorways if the construction and measurements are identical. Just add a colorway page showing which colors apply to which fabric positions. If the construction differs (e.g., a printed version vs. an embroidered version), create separate tech packs.
Can the factory create the tech pack for me?
A factory or a technical designer may help prepare it. Confirm the scope, fee, file ownership and editable deliverables first. Review and approve the measurements, tolerances and construction decisions yourself, regardless of who prepares the document.
What's the difference between a tech pack and a spec sheet?
A spec sheet is just the measurement table. A tech pack includes the spec sheet plus sketches, BOM, color specs, construction details, and packaging instructions. Think of the spec sheet as one chapter of the tech pack.
How do I know if my tech pack is good enough?
Ask a reviewer to identify the materials, construction, measurement method and open decisions without relying on a verbal explanation. Resolve contradictory fields and request the factory's questions before sampling. A readable document still needs to be checked against a physical sample.

