Design your hat in 3DBeta

From Tech Pack to Delivery

Our Production Process

Six stages from NDA to global delivery — each with clear timelines, deliverables and approval checkpoints, so you know exactly how your order moves before you commit.

Sampling 7–10 Days · Bulk Timing Confirmed per Order · AQL 2.5 Inspected

Submit Your Tech Pack See the Six Stages
Cutting room with fabric patterns and sewing lines

The Six Stages

How Your Order Moves

01

NDA & Tech Pack Review

We sign your NDA before any files change hands. Send your tech pack — our pattern team reviews measurements, BOM, stitching and decoration specs within 24 hours, and flags anything that could cause trouble in production before it costs you money.

NDA & Tech Pack Review
02

Fabric & Trim Sourcing

We source from partner mills and dye houses we work with directly — cotton, polyester, nylon, blends, organic and recycled options. You receive physical swatches or a fabric card for approval before we cut anything.

Fabric & Trim Sourcing
03

Sampling

Proto samples in 5–7 days; the full sampling stage runs 7–10 days including fit and pre-production samples. Every sample goes back and forth with your comments until you approve the pre-production sample — bulk only starts after your written approval.

Sampling
04

Bulk Production

Bulk production timing is confirmed in your order-specific quote. Your approved pre-production sample stays on the line as the reference standard, and we send in-line photos at cutting, sewing and finishing so you can follow progress remotely.

Bulk Production
05

Quality Control

AQL 2.5 inline and final inspection on every order. Measurements are checked against your spec sheet, stitching and decoration against the approved sample, and you receive a QC report with photos before anything ships.

Quality Control
06

Packing & Global Delivery

Polybag, carton and labeling to your spec — including FBA prep if needed. FOB Shenzhen/Guangzhou or DDP to your warehouse by sea, air or express, with full export documents and tracking.

Packing & Global Delivery

Timeline

How Long From Order to Delivery

Hoodie in production with measuring tape, spec sheet and color swatches
Stage Duration What You Receive
Tech pack review 24 hours Quotation + spec risk feedback
Fabric sourcing 3–7 days Physical swatches / fabric card for approval
Sampling 7–10 days Proto → fit → pre-production sample
Bulk production Confirmed per order In-line photos at cutting, sewing, finishing
AQL inspection 1–2 days QC report with photos
Shipping Express 3–7 / Air 8–12 / Sea 25–40 days Export documents + tracking

Typical timelines for standard orders — your style, quantity and decoration confirm the exact schedule at quotation.

Common Questions

Before You Start

Do you charge for samples?

Yes — proto samples carry a sampling fee, fully refunded when your bulk order is placed. Complex techniques (special washes, multi-color prints) are quoted separately so there are no surprises.

Can I order without a tech pack?

Yes. You can start with a reference sample, photos or sketches — our pattern team helps turn them into production specs. That said, a complete tech pack significantly reduces sampling rounds.

Can I follow progress during production?

Yes. We send in-line photos at cutting, sewing and finishing. If you want deeper assurance, we can arrange a live video walkthrough or third-party inspection.

What are the payment terms?

30% deposit to start production, 70% balance before shipment after you approve the QC report. We accept T/T bank transfer.

Ready to Start Stage One?

Send your tech pack or idea — get a quotation and review feedback within 24 hours.

Submit Your Tech Pack → WhatsApp Us
WhatsApp

You can change or withdraw your choice at any time using Manage cookies in the footer.

We remember your choice in this browser for up to 180 days. Privacy & cookies